Sales: (877) 243-8313
Service & parts: (450) 372-4242
Granby Chevrolet Buick GMC
COLORADO 4WD CREW CAB ZR2 SHORT BOX (4ZR) | 26-0734
Year:
2026
Odometer:
0 km
Transmission:
8-SPEED AUTOMATIC TRANSMISSION
Drivetrain:
4x4
Engine:
4 Cylinders
Engine (L):
2.7
Fuel:
Gasoline
Exterior color:
BLACK (GBA)
Doors:
4
Interior color:
JET BLACK/ARTEMIS (HFD)
Stock number:
26-0734
VIN:
1GCPTFEK8T1245159
Discover the **CHEVROLET COLORADO 2026**, a new vehicle that combines power and sophistication. This **COLORADO 4WD CREW CAB ZR2 SHORT BOX (4ZR)** model is equipped with a **2.7L TURBOMAX** engine and an 8-speed automatic transmission, offering exceptional performance on all terrains thanks to its all-wheel drive system.
The elegant black exterior is complemented by LED headlights and chrome door handles, while the refined black interior offers perforated leather seats, heated and ventilated for unparalleled comfort. Enjoy advanced technology with the wireless phone projection system for Apple CarPlay and Android Auto, as well as wireless charging for your phone.
The **ZR2 Off-Road Group** includes high-performance suspension and Multimatic shocks, ensuring a smooth and controlled ride. Safety features such as automatic emergency braking and lane-keeping assist provide peace of mind during your journeys.
Come discover this exceptional vehicle at **Granby Chevrolet Buick GMC** at 595 rue Boivin, Granby, Quebec. For more information, contact us at 1-877-243-8313.
CHEVROLET
2026 Colorado
COLORADO 4WD CREW CAB ZR2 SHORT BOX (4ZR) | 26-0734
COLORADO 4WD CREW CAB ZR2 SHORT BOX (4ZR)

Fill out this coupon and receive free oil changes for 2 years with the purchase of a new vehicle.*
*2 oil changes within 24 months. Certain conditions apply.